Generator Removal : Sea Princess : Project Profiles : Home Page

Generator Replacement in 9 Days


 

 

 

 

 

 

 

Service Profiles

Ship Repair Segment Profiles

Voyage Repair

Project Profiles

Craft Profiles


Photos of Recent Projects

Browse photos from the latest projects here.


 
 
 
 
Generator Removal
 
 Stator Housing Replacement
  Generator Installment   Main Page  
 
Cropping an Access

An 15' X 15' access is opened in the aft engineroom bulkhead to allow the faulty generator to be moved.

-read full story-

Building Platform

Cascade General's rigging team bridges the gap between the 20'-high loading platform and the side of the ship with heavy girders.

-read full story-

Moving the Generator Out

The faulty generator emerges from the Sea Princess' side via the dismantled transformer room.

-read full story-

Transporting the Generator

During the night, the 47-ton generator is lifted clear of the drydock by a Whirly crane.

-read full story-