Cascade General Logo

Home PageShip RepairLocations and FacilitiesInternational RepresentativesHuman ResourcesPress RoomRecent ProjectsContact Cascade
Generator Installment : Sea Princess : Project Profiles : Home Page

Generator Replacement in 9 Days


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Service Profiles

Ship Repair Segment Profiles

Voyage Repair

Project Profiles

Craft Profiles


Photos of Recent Projects

Browse photos from the latest projects here.


 
 
 
 
 
 Stator Housing Replacement
  Generator Installment   Main Page  
 
Generator Sliding on Platform

The re-built generator on its way back inside the ship.

-read full story-

Generator Entering Ship

A view of the dismantled transformer room, showing some of the disconnected wiring and piping that was necessary to clear a path for the move.

-read full story-

Generator Being Aligned with V-16 Engine

The generator, shrouded in plastic, is skidded forward to the V-16 Sulzer engine's driveshaft.

-read full story-

Alignment Using a Computarized Fixturlaser System

Using a laser alignment tool to adjust the mounts of the generator to 1/10,000".

-read full story-

Closing Hull

Closing the hull access. (The loading platform is already dismantled, welders ride in a drydock traveling stage).

-read full story-

International
Representatives

Send mail to Info@casgen.com with questions or comments.
Copyright ©1996-2005 Cascade General, Inc.