 |
The 950' Ro/Ro
sealift ship USNS Red Cloud, delivered to the Navy in January
2000, was drydocked at Portland Shipyard for repairs to the
instrumentation on both propeller shafts. Two 20'-long semi-circular
patches were removed from the shaft covers to gain access
to the remote temperature devices (RTDs).
|