The 958, 188,500 DWT tanker BT Alaska was lifted in the Portland Shipyard's Drydock 4 for blasting and coating of the entire hull. The topside work included the replacement of the port and starboard boiler economizers, each weighing 40,000 lbs. (The economizers use exhaust gases from the fireboxes to pre-heat the feedwater.) A temporary access cut 15' X 11' was made in the rear of the deckhouse, the six soot-blower heads and supply lines were removed, followed by the inlet and outlet valves and all associated blankets and lagging. Each economizer was then lifted 6" to clear the foundation combing and removed.

 

BT Alaska

The new units were skidded into position and installed complete with new casings, foundations and piping. The access panels were welded back into place and re-coated. Finally, the finished work was tested to 1.5 times working pressure to the satisfaction of the ABS surveyor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ship Repair Segment Profiles

Voyage Repair

Project Profiles

Craft Profiles


 

 

International
Representatives

Send mail to Info@casgen.com with questions or comments.
Copyright ©1996-2005 Cascade General, Inc.